About Modular Site Hoarding
Modular Site Hoarding belongs to BOHANG's Site Hoarding & Construction Safety range. Structure/surface: 4 white panels, 1 grey panel, 1 beam, 1 post and self-drilling screws; the final project specification should confirm the finish. Applications: Construction-site separation, control of noise, dust and gravel spread, and site beautification. For procurement, material, working dimensions, surface treatment, installation method and quantity should be reviewed together so the supplied format matches the project.
- Material: Panel material with steel framing.
- Typical applications: Construction-site separation, control of noise, dust and gravel spread, and site beautification.
- Installation and supply: Use expansion anchors on concrete or ground stakes in soil.
Technical specifications
Use these fields for initial procurement review. Final values should follow the approved drawing, order configuration and required quantity.
Geometry and construction
- Core specification
- Not provided in source.
- Mesh opening
- Not applicable.
- Dimensions
- Height 2.5 m; post centres 3.2 m/set.
Material and surface
- Material
- Panel material with steel framing
- Structure and finish
- 4 white panels, 1 grey panel, 1 beam, 1 post and self-drilling screws; the final project specification should confirm the finish.
- Data status
- Confirmed master data
Application and supply
- Applications
- Construction-site separation, control of noise, dust and gravel spread, and site beautification.
- Installation
- Use expansion anchors on concrete or ground stakes in soil.
- Quotation information
- Height, length, sheet thickness, post/beam wall thickness, ground condition and wind requirement.
Materials and surface treatment
Review the base material, construction and finish as one working product specification.
Base material
Panel material with steel framing.
Construction and finish
4 white panels, 1 grey panel, 1 beam, 1 post and self-drilling screws; the final project specification should confirm the finish.
Обработка поверхности
- 4 white panels, 1 grey panel, 1 beam, 1 post and self-drilling screws; the final project specification should confirm the finish.
- Confirm the final finish, color and post-processing requirements before production.
Available configurations
Dimensions, opening, material and finish can be reviewed around the required application and supply format.
Applications
Use the working environment and installation method to confirm whether this product is suitable for the project.

Packaging and shipping
- Packaging is arranged around product form, finished size, surface condition and loading method.
- Long, coated or fabricated components are separated and protected according to the loading plan.
- Confirm destination, quantity and container requirements before final packing.
Procurement documents
Buyer questions
What information is needed to quote Modular Site Hoarding?
Height, length, sheet thickness, post/beam wall thickness, ground condition and wind requirement.
Can the specification of Modular Site Hoarding be adjusted?
Yes. Available production routes depend on the material, geometry, finished size, quantity and required surface treatment.
How is Modular Site Hoarding packed for export?
The packing method is reviewed against product form, finished dimensions, surface protection, handling and container loading requirements.
Send the project requirement
Height, length, sheet thickness, post/beam wall thickness, ground condition and wind requirement.
Запросить расчет



