Досье проекта
Описание проекта
Контекст применения, визуальные материалы и данные технического выбора представлены в единой карточке проекта.
A civil-work case for erosion control at a channel edge, where drainage continuity and basket stability were considered together.
- Область применения
- Geotechnical and slope works
- Область применения
- Drainage and erosion control

The case was developed around the slope profile, drainage route and locally sourced rock size. Basket dimensions, wire treatment and delivery sequence were coordinated so installation could proceed in manageable sections.

Техническое задание
Продукция и характеристики
Civil selection points
- Ground
- Slope, retaining or drainage condition
- Fill
- Stone size and fill method
- System
- Basket, roll or reinforcement panel

